loading...
|
Muddywater
|
The user is required to configure the air or power switch of the corresponding capacity for the muddy water test chamber at the installation site, and the switch must be independently controlled. When the equipment is used to place the power sample in the box, the sample power supply should use the external power supply, and the power supply of the machine should not be used directly. |
Join Group |
|
|
|
|
You must
Join This Group to Start a Discussion.
Be the first to start a Discussion! |
|
|
|
|