A Fiberglass pool is actually designed with the help of acrylic shell or fiberglass which is placed in a hole in the ground. There can be in-ground and above ground fiberglass pools. The aboveground fiberglass models are actually framed by using the materials like plastic or metal, which are similar to vinyl-lined swimming pools. Sometimes the concrete pools are lined with the fiberglass rather than plaster, this is because the fiberglass need less maintenance compared to plaster. Have a look at the fiberglass pool installation processIf you consider the fiberglass pool installation process, it has classified into 6 phases such as
The very first thing the crew members will perform is paint the pool on the ground and they utilize laser level to start how much height the pool has to be set in the yard. This gives an idea about how much deep they have to dig the hole. Then the crew members will place the dump truck closer to the hole and start excavation. This process may take 3 hours.
After completing the excavation process, you have to place 2 thick layers of gravel in the hole that the pool will rest on. The base of gravel decides the height of the pool; hence you can utilize laser level in order to set gravel accurately at the proper elevation.
The filter system is actually composed of 2 main components- the filter and the pool pump. The filter aid, to remove the small particles and debris from the water and the pump circulates the water. At the filter system you can conventionally find the other elements likes a heater if needed, a switch for the pool, salt water Chlorinators and the valves that control the water flow.
After plumbing, the pool has to be set in the hole and leveled, then, begin to fill the pool with water and backfilling around the outside with the help of gravel. During this phase of construction it is very essential to install the drain pipe. This pipe extends from the top of the patio till to the bottom of the excavation.
After the pool is fully backfilled and the inspection is approved, then they will install the coping around the top of the pool patio and pool shell. The patio may take 2 to 5days to install based on the material used and the size of the patio. The most essential role of the patio is nothing but locking the pool shell into place.
After the fiberglass pool gets installed and the patio complete, now it is the time to wrap everything up is an approved pool fence. The minimum fence height must be 48”. Usually the pool fence is installed by digging the post holes in the ground outside the pool patio. To secure the fence posts in the ground Sackcrete is utilized.
|
||||||||||||||||||
|